West Mall (Hy-Vee) Parking Lot Rehabilitation Project
Project Name:
     West Mall (Hy-Vee) Parking Lot Rehabilitation Project

Project Location:
     The parking lot located west of the Hy-Vee grocery store at 110 South D Street in Oskaloosa         


Project Description:
  • The scope of this project included all work related to the asphalt overlay of an existing concrete parking lot. 
  • This project received one bid from Norris Asphalt Paving Company.
  • Construction activity lasted 5 working days.

Project Benefits:
The existing concrete parking lot surface had begun to fail and was in need of constant maintenance.  Therefore, the parking lot surface was overlaid with 2.5 inches of asphalt.  In addition to the overlay, the existing pavement joints that had failed were milled out and then filled with asphalt prior to the overlay.  As a result of this project, the parking lot pavement surface will be safer and more durable for vehicles and pedestrians.  

Project Status:
Norris Asphalt Paving Co. began construction on September 19, 2016 and completed the project on September 23, 2016. 

Total Project Cost: $168,482.95
               
Phase Start Date
09/19/2016
Phase End Date
09/23/2016

Project Completion
The asphalt overlay was completed on September 23, 2016.